DEATH VALLEY NATURAL HISTORY ASSOCIATION
OFFICE / WAREHOUSE PROJECT
Death Valley, California.
| START DATE: November 10, 2001 CONTRACT COMPLETION DATE: May 15, 2002 SCOPE OF WORK: Construction of a new 3060 square foot combined office warehouse building. PEMB, concrete slab on grade, masonry, metal stud interior partitions, gypsum board, cabinets, windows, suspended acoustical ceiling, doors, electrical, HVAC, plumbing, fire sprinkler, fire alarm, data base conduit & wiring. Special Construction R-43 insulation for Roof and Walls. |

Project Site
Loading Dock Site

Pothole For Water Supply Water
Tap & Main Valve

Water Supply Line
Main Water Supply Valve

Sewer Connection @ Main Sewer
Cleanout @ Main

Sewer Line
Sewer Connection For Cleanout

Sewer Cleanout @ Building
Toilet & Sink Drains

Toilet Sewer Lines
Water Supply Valve
Common Trench for Elec., Telephone, & Water
Perimeter Footings

Perimeter Footings
Rebar in Masonry Footings

Rebar in Masonry Footings
Rebar in Block Loading Dock

Importing of RO Water for Masonry Completed
Block Loading Dock

Placement of 10 Mil Poly in Footers
Poly in Column Footings

Forms & Compacted Base
Pouring of Concrete

Building Slab
Placing Curing Blankets

Kelly Penrod Placing First Column
Building Layout

Placing First Beam
Placing High/Low Roof Beam

Framing of Windows
Framing of Windows & Door Way

Unused Vent Framing
Heavy Iron And Purlins in Place West View

Heavy Iron And Purlins in Place South Views

Infrastructure Fascia Trim
High Foundation Wall

Portal Frame Attachment
Attaching of Wall Panels

Layout of Interior Walls
Epoxy Anchor Bolts

Interior Wall Framing
High Rider System

Purlin Cap and High Rider System
Dry pack in Front Porch Area

Anchor Bolt Placement

Framed Interior Walls
Framing of Windows

Girders & Purlins In Place

Wood Trim on Beams For Drywall Placement Framing of Doors
& Windows @ Loading Dock

Roof Purlins
Exterior Wall Framing

Wall Panel Connection
Alex Lopez Cutting Wall Panels

Placing Soffet Panels in Font Porch Area
Completed Wall Panels

Placing Roof Insulation & Panels
South Elevation

Thrust Block Under Slab
Coring For Fire Supply Riser

Under-Slab Fire Supply Line Ductile
Connection For Fire Supply

Fire Supply Line
Dave Moore Compacting Fire Supply Line

Pressure Tested For 2 Hours @ 150 PSI Water Supply
@ Backflow Preventer

Jimmy Clair With Completed Backflow Preventer Backflow
Preventer Ready For Cement

Irrigation Line
Warehouse HVAC Unit

Office HVAC Duct Work Warehouse
HVAC Unit

Office HVAC System Bathroom
Exhaust Fans

Exhaust Vent Penetration to Exterior of Building Rough In Plumbing
For Water Heater & Mop Sink

Completed Bathroom Rough In Plumbing Rough
in Bathroom Plumbing

East Wall Insulation & Framing South
Wall Insulation & Framing

Firewall & High Wall Steel Framing
Wall Insulation & Electrical Conduits

Roof & Wall Insulation
Plywood Skin in Warehouse

Un-taped Drywall in Hallway
Hanging Suspended Acoustical Ceiling Grid

Bathroom Cabinet Greg Mayhan Placing Chair
Rail Steve Lewis Hanging an Exterior Door

Installation of Chair Rail in Exec. Director’s Office
Fire Wall in Warehouse

High/Low Roof Wall
Jason Hoehn Installing Interior Horn/Strobe

Shawn Lovato Connecting Water Flow Switch Installation
of Suspended Acoustical Ceiling

Fire Alarm Circuit Board Shawn
Lovato & Jason Hoehn Testing Fire Alarm System

Jason Hoehn Installing Exterior Horn/Strobe Jerome
Cardenas Hanging Telephone Backboard

Data & Voice Cabling
Data & Voice Punch box

Exhaust Fan & Hood
Main Breaker & A/C Unit

Bump Stop Installation
Dust Storm

Finished Bathroom
Water Heater

Telephone Conduit @ Pedestal With Thrust Block
East Elevation

North Elevation
South Elevation

November 28, 2001

May 14, 2002