Dormitory - 4000
Site Utilities.
Chalone Creek Support Area, Pinnacles, CA.
11-11-02 to 11-18-2002

Asphalt Grinding
Machine Removing Asphalt for 6 Water

Steve Layton Grooving Pipe for Temp Water By-Pass Ground Up Asphalt Roadway

K. Nickerson Excavator on Site Temp 3 Line Completed

Temporary 3 Water Line In Place Temporary Water Tanks, During
Refinishing Of Main Tank

Oak Tree Removed, Future Dorm Site C. Cardenas Capping Water Main,
So Dorm Pad Can Be Cut

Capped Main K. Nickerson Compacting Keyway on New Entrance

Excavation over Pad, Started Steve Layton Clearing Tree Brush

C. Cardenas Cut Main Tree Trunk 46 Across, Red Oak

C. Cardenas with New
Stihl

Loading Hi-Side with Tree Roots & Brush
November 25 to December 5, 2002

Old LP Gas Pipe Removed From Trailer Pad C. Cardenas Installing New Water Line for Trailers

Sheeps Foot Compacting Trails Pad Leveling Fill Trails Pad

Smooth Drum on Trails Pad Steve Layton Grooming Around Trailers

Gym at New Location Ready to Be Leveled Finished Fire Cache Pad

Completed Moved & Hook-Up Gym & Lab Looking Across Back of Fire Cache to Entrance Ramp

Gym Setup on New Location Final Grade on Trails Pad

Placing Fill on Ramp Looking Toward Project from Access Road

Cameron Cardenas Assembly of Valves Duplex Pad

Temp Water Trailer 3 Sag in Top of Bed Nicholson Scraper Removing Dirt from New Duplex Pad

Entrance Ramp, Still Needs 12 Culvert 6 Valve Installed In Tank Line To Site

Tank Valve with
Kicker Installed Placing
Kicker on Valve for 6

Jimmy Clair & Cameron Cardenas New 4 Valve Tie In For Trail Fire Sprinklers
Pipe + Valve Installers Inc.
December 9, 10, 11, 2002

Trenching Riser on

Fire Cache Chalked Out For Trenching Vapor Barrier Spread on Fire Cache
Cameron Cardenas Pressure Testing Riser

Al Plaxton & Cameron Cardenas Mc Kibbon Plumbing Installing Waste Lines
In

200 PSI on Sprinkler Riser Fire Cache Waste Lines Installation

Cameron Cardenas, Jimmy Clair Testing
Riser 200
PSI -
In

Sand Installed On Fire Cache Vapor Barrier Going Down Over Gravel,

Trails Vapor Barrier C. Cardenas Preparing Fittings

Leveling Sand in

Trace Wire Installed
On 4 Fire Line to

C. Cardenas Assembling
90°
D.I. Fitting Fire Line To

#4 Rebar Matt Ready for Dobbies Fire Cache

Rebar In Footings Fire Cache
December 9, 10 & 11, 2002

Trenching Riser on

Fire Cache Chalked Out For Trenching Vapor Barrier Spread on Fire Cache
Cameron Cardenas Pressure Testing Riser

Al Plaxton & Cameron Cardenas Mc Kibbon Plumbing Installing Waste Lines
In

200 PSI on Sprinkler Riser Fire Cache Waste Lines Installation

Cameron Cardenas, Jimmy Clair Testing
Riser 200 PSI -
In

Sand Installed On Fire Cache Vapor Barrier Going Down Over Gravel,

Trails Vapor Barrier C. Cardenas Preparing Fittings

Leveling Sand in

Trace Wire Installed
On 4 Fire Line to

C. Cardenas
Assembling 90°
D.I. Fitting Fire Line To

#4 Rebar Matt Ready for Dobbies Fire Cache

Rebar In Footings Fire Cache
12-23-02 to 1-7-03

6 Water Trench, Look Toward Building 300 C. Cardenas Assembling 225 P.I. Fitting,
Behind Fire Cache

Diversion Next To Fire Cache, For Rain Water Sand Bagged Area behind Fire Cache

Setting Floor Drains, Trails Building 6 Water Line Heading toward Duplex 101 & 102

Al Plaxton Vibrating Footings Pouring Footings, Fire Cache

Pouring Fire Cache Slab Fire Cache Poured out

Footers
Poured,

Pouring

6 Water Line In front Of Duplex Al Plaxton Cutting Joint in New Slab

Al Plaxton Cutting Joint in New Slab Soft Cut Machine

Joint in New Slab, Final Product C. Cardenas Backfilling with Skip Steer

C. Cardenas Backfilling with Skip Steer Tee & Valve In Front Of Duplex, 22.5 D.I. Fitting

Looking To 22.5 Valve Assembly Looking Toward Duplex 102, 6 Gate Valve
Week of 1-13-03

Compacting 6 Water Line Looking Toward Tank Line Need Breaker Point

C. Cardenas Bedding Pipe 6 Lateral Looking Toward Old Duplex 102

Looking Toward Tank Line, Hit About 30 FT of DG That Had To Be Broken Up With Breaker Point

Broken Up Ground in Water Trench Mod to High Pressure Waste Line Shorten Up Feed

Coupler Fitting On 6 Water Pipe C. Cardenas Back Filling

Eric Freeth Reviewing Plans, Trails Unit Plated Trench for Culvert under Entrance

D. Moore, R. Akerstrom Cutting Studs Info on Culvert Pipe

Undoing Valve, Ready to Remove Hydrant C. Cardenas Removing Hydrant

Removing 2ND Hydrant Removed 6 Barrel Hydrant W/4 Valve

Kurt Lanning, Compacting Soil over Culvert, Mark Nicholson Behind
Week 1-20-03 to 2-4-03

Relocated Hydrant #2 Ditch Looking Toward Existing Ductile Iron Pipe

150-PSI Test on Main
Water Line
Walls Stood Back Of

Walls Stood Back Of Trails Building Ridge Beam for Fire Cache

Front of

Framing Walls Fire Cache Mike Cardenas Conferring With Head Carpenter,
Eric Freeth

Side Walls Fire Cache Framed 1st Load GG&E Sand for Bedding Conduit

Nailing Blocks, Trimmers in Side Walls Walls Stood On Fire Cache

Ready To Frame Front Wall

Mike Cardenas Cutting Out Lookers in Gable Trusses Hand Trenching Around Existing Utilities

Trenched & Sand Installed, Main Electric Ditch

Trenched & Sand Installed, Main Electric Ditch Conduits Installed Toward Main Vault

Conduits Installed To Main Vault Conduit Penetrations

Conduit Penetrations Inside Of Vault, Ready For Grout More Hand Digging

Rear of Fire ½ Sheared Cameron Cardenas, Eric Freeth,
Installing Shear on Fire Cache

Framing Complete
Week 2-5-03 to 2-13-03

Jimmy Clair Grading With New Skid Steer Twin Scissor Lifts in Action on Fire Cache

Electrical Trench toward Comfort Station Electrical Penetrations in Vault

Setting Ridge Beam on Fire Cache Cameron Cardenas, Eric Freeth

Ridge Beam Set Conduits to New Buildings

Conduits Grouted Into Vault

Conduit to Comfort Station Grouted Inside Vault

Grouted Vault

Toby
Week 2-18-03

Extra Job Installing 4 Gate Valve in Supply Line from Tank

Extra Job Installing 4 Gate Valve in Supply Line from Tank

Jimmy Clair Painting Overhang, Cameron Cardenas Tending and Driving Lift

Steve and Toby
In Fire Cache Building 300

Removing A/C Unit on Building 300

Removing A/C Unit on Building 300

View of Project from Entrance
Week 2-20-03

Concrete Chipped To Install Termite Shield Termite Shield Installed

Fire Sprinkler Riser in Trails Maintenance Fire Sprinkler Riser, Fire Cache

Test Gauge, Fire Cache

Vapor Barrier,
Fire Cache

2-21-03

Sprinkler Test
Sprinkler Riser in

Sprinkler System in Fire Cache

Completed Repair on HVAC Roof Removal,
Building 300

Eric Freeth Installing Tar Paper on Fire Cache Robert Akerstrom Installing Tar Paper on Fire Cache

Trench to

Utility Trench with
2-24-03

LP Gas Tee from Trail and Fire Cache, with Tracer Wire LP Riser at Fire Cache

LP Gas Riser,

Trench Line with Marking Tapes 30LBS on LP Gas Line Test

Lines to Maintenance Yard Inside Power Vault, Building 300

Inside

Eric Freeth Papering

Installing Paper on Trails Roof

Evaporative Cooler
Ducts in

Cameron Cardenas
Delivering Bedding Sand to
2-25-03

Hand-Dug Electric
Trench behind Lounge Toby

Stocking Roof

Eric Freeth Installing Flashing, Starter Strip, Hand-Trenched Line behind Maintenance Office
And First 4 Rows Of Shingles

4 Telephone Line, 11/2 Electric behind Building 300 Electric And Phone Vaults Behind Building 300

Pumping Old Septic Tank Washing Out Tank

Rinsing Tank and Final Pumping For Abandoning
2-27-03

Rinsing Old Septic Tank and Final Pump Punching Holes in Bottom after Lid Removed

Breaker Point at Work, Side View Spreading Ύ Rock in Old Tank

Rock Completed Start Backfill

Placing Sealer between Grade Rings behind Cameron Cardenas Compacting Around New
Building 300 Vaults behind Building 300

Existing Manhole with Completed Bore for
3-4-03

Sewer Line Installed Into Manhole to
Manhole Completed Line from

Roof of Trails in Progress Completed Grout around Metal Column in Fire Cache

Saddle Installed On Water Main for Trails Cleaning Bored Holes for Epoxy Prior To
Installing Anchor Bolts at Mud Sill Splices

Robert Anderson Removing Limbs from Large Branches

Picking up Logs with the 446 Cat Backhoe 100 Pine, 80 Boom Lift, Jimmy Clair and Cameron

Robert Akerstrom Removing Brush from Logs
3-6-03

Tony from Tognettis Electric Working on Completed Trails Fire Sprinkler Riser
Trails Sub Panel

Evap Cooler Duct Work
in

36 Diameter Stump from 100 Tall Pine Log Pile

Digging Out Stump Jimmy Clair Proud Of His Roots!

Had To Use Gradall to Remove Roots from Here Hole With Stump Removed,
Ready to Clean Out Roots
3-10-03

International, Looking Through Rear Window Seal Installed On Bottom of Manhole by Lounge
Of Fire Cache

Grout Used To
Insure Seal
Cameron Cardenas, Toby
Grade Ring with Sealer

6 Sewer Line From New Manhole across Completed Manhole by Employee Lounge
Maintenance Yard

Looking Across Maintenance
Yard Toby
From New Manhole

Siding Being Installed On Back of Fire Cache Shoring Box Used For Sewer. We Stepped the Trench
Later So We did Not Have to Use It.
3-18-03

Manhole Water Tested Completed Manhole

Installing Grout for Grade Ring 2nd Manhole, Dorm Duplex

Grouting For Ring

Hook-up Hole in Existing Manhole 6 Line Installed In Existing Manhole
Behind Comfort Station

Ready to Seal New Penetration Cameron Cardenas Backfilling New Sewer Line
from Dorm Duplex
3-26-03

Sewer Trench to Dorm Duplex Completed, Utilities in Trails Ceiling
Groomed Back to Nature

Finished Siding on Fire Cache Robert Akerstrom and Cameron Cardenas
Installing Siding on



Eric Freeth Installing Wainscot in Fire Cache Steve Lewis Installing Interior Door Frame
4-10-03

Robert Kramer of
Working on Alarm System

Eric Freeth
Hanging Drywall
Last Board to Hang In

Sealed Green Board in Restroom Jimmy Clair Painting Back Of Fire Cache

John Simons Installing First Coat of Drywall Mud Joints Taped In

View from
4-14-03

Eric Freeth Building Door Frames Cameron Cardenas Cutting, Painting on Wainscot

Plastic Installed Over Doors Help Dry Mud Installing Tongue and Groove on Garage Doors

Garage Door Tongue And Groove Installation Completed Door

Installing Hinged, Doors Paired Up

Eric Freeth Installing Hinges Doors Being Fabricated In Fire Cache
4-22-03

Nicholson Patching Trench Line in Maintenance Yard Final Rolling Of Patch

Removing Asphalt on Road Next To Fire
Cache Jimmy
Clair Painting Interior of

Painting Door Trim Jimmy Clair Painting Shop Doors

Installing First Pair of Doors on Fire Cache Fire Cache Stoop Ready to Pour

Eric Freeth With First Set of Completed Doors
5-1-03

Fire Cache Stoop Poured
R/A & Feed Holes Cut In Building

Eric Freeth Finishing First Sidewalk Pour on
Trails Sidewalk Return around Rear of

Jimmy Clair Installing Back Rod and Formed Sidewalk In Front Of Trails.
Polyurethane on Fire Cache Windows Base Being Installed

Robert Akerstrom Grooming Around Tree Front Sidewalk Ready for Wire Mesh

Cameron Cardenas Finishing Front Sidewalk
5-8-03

Relocation of 6 Gate Valve on Feed to Park

Relocation of 6 Gate Valve on Feed to Park

Trench Line of Rerouted 2 Conduit to Pump House Rob Hill Doing CTE Compaction Test on Dorm Pad

Completed Dorm Pad Jimmy Clair & Cameron Cardenas Applying
First Coating to
5-21-03

Trenching For Duplex Footing, Jimmy Clair on Hoe, Robert Akerstrom on Shovel

Nicholson Engineering Compacting Entrance Eric Freeth and Cameron Cardenas Forming Duplex

Upper Area Trenched On Dorm Robert Akerstrom Checking Grade On
Footing At Lower Area of Dorm

Kurt Lanning from Nicholson Engineering Grading Entrance to Housing
6-3-03

Cameron Cardenas Forming Duplex New Culvert under Entrance

Bottom Rebar Ties Ready for Dobbies Robert Akerstrom Grooming Dorm Footing

FINE TRUCKS! Nicholson Grading Base in Trails Parking Lot
6-4-03

Beginning To Remove Old Float Control Valve Robert Akerstrom Harnessed and Entering Tank
To Undo Bottom Bolts On Valve

Robert Akerstrom Entering Tank Valve Removed

New Valve Completed Steel Work Completed In Duplex Footings

24 Spacing on Duplex Uprights 20 Wide Footing on Duplex

Final Grade Base in Parking Lot
6-5-03

First Truck for Base of Footers Coordinator Herb Wosencroft Watching
Start of Footing Pour

Setting Column Base Eric Freeth Finishing Top of Footing

CTE Tech Checking Slump and Cylinders Cameron Cardenas Finishing Duplex Footing

Cameron Cardenas Completing Duplex Footing Cutting Keyway into Top of Footings

Keyway Cut Into Top Of Footing Pour On Footing Complete. Eric Freeth And
Cameron Cardenas Finishing Last Of Footings
6-9-03

Dorm Pad With Footer Trenched Al Plaxtons Crew Getting Ready with Forms

Inside Plywood Panels Being Installed On Duplex

Duplex, Looking East Outside Forms Installed On Dorm

Installing Steel Uprights on Dorm at 24 O.C. Ready To Pump Duplex Walls

Cameron Cardenas Doing Final Prep For Pour on Duplex Duplex, Looking West
6-17-03

C & C Concrete Pumping Set-up Al and Eddy Plaxton Help Finish Stem Walls

Eric Freeth Finishing Stem Walls on Duplex Mike Cardenas Guiding Hose,
Robert Akerstrom Running Vibrator

Center Piers on Duplex Poured and Stirrups Set Setting Up To Pour Dorm

Preparing To Pour Dorm Al Plaxton Running Hose

Finishing Top of Dorm
Stem Wall

Upper Level of Dorm with Stem Wall Floated Troweling Dorm Stem Wall

Al Plaxton Filling Piers on Dorm Mike Cardenas Assisting In The
Finishing Of Stem Walls

Front of Dorm Stem
Walls Stripped

Garage Openings on Duplex

Looking East on Back Side of Duplex
6-18-03

Skid Steer on Ramp, Used To Skid Steer at Work
Drive Unit into Complex

Filling and Compacting Duplex Front Porch Area Skid Steer Moving Dirt inside Duplex

Dave Moore Compacting and Robert Akerstrom Two Stem Walls Finished Inside Duplex
Spreading Dirt inside Duplex

Inside View of Dorm Stem Walls before Backfilling and Compaction

Looking At
6-19-03

Backfilling Inside of Dorm Walls

Working on 2nd Level, Dorm Completed Inside Stem Walls, Duplex

Over-all View of Work on Dorm Backfilling Dave Moore Leveling Fill, Dorm

Eric Freeth And R. Akerstrom Dorm Fill ½ Done
Installing Termite Shield

Over-all View of Duplex Showing Completed Concrete, Beginning of Framing
6-23-03

Duplex Foundation with Termite Shield, Sill Sealer, and Sill Plate Installed

Sub Floor Beams Installed On Duplex Robert Akerstrom Sealing around Anchor Bolts

Eric Freeth Installing Sill Sealer Cameron Caedenas and Dave Moore
Bedding Duplex Sewer Pipe

Center Connection of Duplex Sewer Duplex Sewer Line Passing Through
Sleeve in Foundation

Dave Moore and Jimmy Clair 3 Sewer Clean-outs In Front of Duplex
Trenching To Manhole

3,200 LBS of Stump Being Hauled Away From Site
6-25-03

Eric Freeth and R. Akerstrom Working on Dorms Sub Floor Beam

Completed Sewer Lines On Duplex. Eric Freeth Inspecting Sub Floor Work

Lumber Delivered For Dorm and Duplex Jimmy Clair and Dave Moore Coating
Duplex Walls with Damp- Proofing

Back Duplex Wall Coated. Note Dirt Pile! 4 Water Main to Dorm

Dave Moore Compacting Entrance Completed Sub Floor Joist On Duplex
To Duplex Garages

Installing Sub Floor Joist on Dorm. Damp-Proofing Completed
7-8-03

Robert Akerstrom Working on Cameron Cardenas Installing 4 Water
Sewer Line from
Dorm

Mike Cardenas Moving Dirt for Sewer Line

Sewer Line from Dorm Dorm Line into Manhole

Dorm Sewer Line

Backfilled Clean-out By Dorm Kitchen Dorm Clean-out, Upper Level
7-14-03

Dave Moore Compacting Fill Next To Dorm Sheeting Duplex, Floor Insulation Installed

Plumbing Installed On Duplex Subfloor Double Check-Valve Water Meter,
Curb Stop behind Duplex

Meters Hooked Up To Water Main with 1 Saddle Cameron Cardenas Sheeting
Upper-Level Dormitory Floor

Lower Dormitory Subfloor Insulated J & E Mechanical Fabricating Continuous Rain
Gutters for Fire Cache & Maintenance Buildings

Installing Rain Gutters on Fire Cache (J & E Mechanical)
7-29-03

Nickleson Engineering Grading Around Duplex Completed Backfill around Handicap on Duplex

Cutting Swale around Side of Duplex Upper Rooms Framed On Dorm

Cameron Cardenas Completing Sheeting Dave Moore and Robert Akerstrom
On Lower Level of Dormitory Framing Upper-Level Walls

Rear of Duplex Walls with Shear Panel Swale Cut on East Corner of Duplex

1 Ό Water Meter and Curb Stop to Dormitory 2 ½ Electrical Ducts to Vault Behind Duplex
8-7-03

LP Gas Line and Phone Conduit from Dorm LP Gads Line and Phone Line
Going Around Electrical Box

Marking Tape Installed In Utility Trench Electrical Ducts Terminated Behind Trailer Spaces

Trusses Loaded On Front of Dorm Conduits Terminated Behind Duplex

Electrical and Gas Lines Being Readied LP Line with Tracer Wire Installed Behind Dorm
For Installation, Eastern Duplex

Trusses Installed On Dorm
8-14-03

Robert Akerstrom Installing Grout Electric Vault Housing with Future
Between Top Ring and Vault Dorm Line and 2 Stubs Out

Cameron Cardenas Working On Dorm Overhang Cameron Nailing Off Shear Panel
on Gable Truss for Duplex

Looking At Back Of Duplex, East Gable Stood Completed Framing, Viewed From Rear of Dorm

Eric Freeth and Cameron Cardenas Installing First Run of Plywood on Back of Duplex

Front of Duplex
Trusses Stood Looking at Dorm from
8-27-03

Fire Sprinkler System at 210 PSI Duplex Riser Holding at 210 PSI

Dorm Riser at 210 PSI
9-3-03

BCS Mechanical Installing Duct in Duplex Dorm Roof Dried In and Stocked

Tony (Tognettis Electrical) Wiring Kitchen in Dorm Duplex Entrance on the H/C Unit

Dave Moore Drying In Duplex Cameron and Eric Framing Drops In Kitchen

Switch Gear Pad behind Duplex Ready for Pour LP Pad Ready to Pour
9-8-03

Future Dorm 2 1/2 Line Installed

Future Dorm 2 1/2 Line Installed

Looking at

Looking Along
9-9-03

Installing Base Duplex Apron Forms Set Base Install, Duplex Entrance

Installing Base, H/C Duplex Entrance Dave Moore Installing Window Trim

Working on Dorm Window Trim Al Plaxton Showing Us His Stoop

Duplex Rear Stoop Poured Installing Base Dorm Patio

Garage and Apron Poured on Duplex

Cameron Cardenas Running Eave Metal and First 5 Rows of Shingles from Man Basket
11-5-03

Zzzzzzzz Western Cabinets and Counters,
Working on Dorm Kitchen

Headquarters Kitchen Cabinets completed Tony from Tognetti Electric
Ready to Pull Wire in Vault

Spools of Wire for Underground Jambs and Casings Masked Off
Ready For Painting of 2nd Color

Duplex 2 Kitchen Cabinets Jimmy Clair Standing Window Casing in Duplex

Tognetti Electric Installing New Switch Gear for Maintenance Yard,
JRCCI Gradal Being Used
11-20-03

Floor Store Installing Vinyl Dave McKibbin Installing Sink in 2nd Duplex
In Headquarters Kitchen Unit

Marta Cardenas Sanding 2nd Coat in Dorm Cameron Cardenas Standing Casing in Dorm

Forrest Anderson Standing Jamb, Second Coat Jimmy Clair Painting In Dorm

Access Grill Installed On Dorm, Front Dorm Windows Masked Off
JRCCI Fabricated

Looking Down Side of Dorm, Dorm Kitchen Cabinets Being Installed
Windows Masked Off